Foo Fighters played two nights at the former London Olympics venue (photo: Mark Cunningham)
UK - Foo Fighters shook the 80,000-capacity London Stadium to its core on two consecutive nights, as they performed on a Stageco stage on their latest tour, Concrete & Gold.
Essentially treated as a one-off for Stageco, the band played under a regular Super Roof, the company’s second largest after its voluminous XXL model, which was constructed within three days by a team headed by David Van Assche, who held the same position last summer on tours by Jeff Lynne’s ELO and Guns N’Roses. “This roof came from another one-off in Hamburg,” says Van Assche. “On a tour, we could take half a day off of the build time, but one-off shows like this don’t carry the same momentum.”
The equipment arrived at the former London Olympics venue in Stratford in 17 trucks. 12 Stageco crew set to work on the build with assistance from 15 local crew climbers and 15 hands. The roof was lifted using the latest generation, computer-controlled winch devices. Van Assche adds: “It was a heavy build for us, however, after Beyoncé & Jay-Z’s shows at this stadium, Antonio Duarte Da Cruz’s team had a two-day break and so they helped us out which meant that at one point we had 20 people working on this.”
Although it may have appeared to be a standard festival roof to the casual onlooker, it was reinforced to be stronger than usual in order to offer a weight capacity of 40 tonnes of production, including PRG’s lights and upstage WinVision screen, which was configured within a flown diamond-shaped frame. Measuring 25m wide between its towers and 61.12m between the edges of the large PA and video scaffolding wings, the stage had a depth of 15m and a trim height from the floor to the bottom of the truss of 16.55m.
The total height was 25m. “It fits just 1.5m under the stadium roof,” says Van Assche. “That is the maximum height we can achieve at London Stadium. We pushed the stage back as far in front of the audience stand as it would go.”
Stageco’s client was Roy Morley of Site & Event Logistics who was working on behalf of the promoter, SJM Concerts. The company also co-ordinated the build with production manager Bret Chin-Quan, tour manager Gus Brandt and stage manager Andy Pollard. In addition to the stage, Stageco provided the two front of house risers and four delay towers that incorporated PRG’s remotely controlled spotlights.
At the Foo Fighters’ two London Stadium shows, they were supported by Wolf Alice, Frank Carter & The Rattlesnakes, The Kills, Slaves and Starcrawler. The Super Roof remained on trailers for three weeks before being rebuilt at Twickenham Stadium for Eminem’s two shows on 14-15 July, part of his Revival tour of Europe. In the meantime, Van Assche was preparing for his next Stageco project: a Bruno Mars show on at the Stade De France in Paris.
(Jim Evans)

Latest Issue. . .