York Barbican Centre is probably the first venue in the country to install a lifting beam in its auditorium to enable mechanical lifting of mixer control desks for shows. Prior to its installation, moving the desks into position often took 20 minutes and could use up to 12 crew. The venue now has a 20m runway beam with a 1 ton electric trolley and 1 ton electric chain hoist attached. A spreader beam can also be attached to spread the weight and these are all controlled by an infra red pendant. With the new equipment, the desks can now be moved in five minutes with just two staff. The equipment cost £12,000 and took just two days to install. Bootham Engineers of York manufactured the equipment specifically for the Barbican's needs.

Latest Issue. . .