Installation News

New Remaster Suite for Abbey Road
Monday, 4 October 1999

Abbey Road Studios has opened a new remastering and audio restoration suite, where award-winning engineers Simon Gibson and Andrew Walter will be working to provide clients with state-of-the-art technical equipment and the benefit of their experience in the production of high quality remastered recordings. The new facility is equipped with 5.1 surround sound monitoring to enable the remastering of multi-channel recordings for DVD, offering a one-stop shop for clients considering the transfer of archive material to DVD.

The Cross, London
Friday, 1 October 1999

Pro Sound & Light Services was recently commissioned to design a specific audio system for the Cross nightclub in London's Kings Cross area. The company's Andy Linklater designed and installed the system using RCF's Vision Series contractor loudspeakers. In designing the system, Linklater had to deal with brick archways, low ceiling heights and potential noise complaints from local residents. A total of 10 RCF Vision PA281 enclosures, four RCF Vision PA261 enclosures and eight RCF 18s800 chassis in custom-designed sub bass enclosures were used to realise the seamless coverage patterns.

 
 
Maltbury Completes Refurb
Thursday, 23 September 1999

Maltbury's Special Projects team has recently completed a major project for the De La Warr Pavilion in Bexhill-on-Sea, where it supplied and fitted a bespoke, demountable seating tier system, comprising 64 special Metrodeck frames, to the 1,000 seat auditorium in the art deco, Grade 1 listed building, situated on the town's seafront. The £800,000 refurbishment and restoration of the auditorium is part of a wider refurbishment programme of the Pavilion and was completed within the five-week 'window' in August and September.

 
Royal Court Rebuild
Sunday, 12 September 1999

The Royal Court Theatre in London's Sloane Square is in the final stages of a massive rebuild programme, costing in the region of nearly £26m. Bristol-based Stage Electrics won the competitive tender to supply and fit the production lighting, sound and communications systems worth around £1million, to a specification originated by the Royal Court and their consultants, Theatre Projects.

 
 
A Dream Come True
Saturday, 11 September 1999

After 12 years of planning, the Dream Factory finally opened its doors officially for the first time last month. The permanent Warwickshire home of the Playbox Theatre, the Dream Factory is the first purpose-built young peoples' theatre in the UK. Sceno Plus, the design arm of Cirque du Soleil, was responsible for the theatre design, the technical aspects of which were put into practice by Northern Light. Lighting is Strand throughout, whilst the sound is simple but effective, with a variety of Crown-powered Martin Audio cabinets, a 24-channel Soundcraft K1, with FOH and backstage paging amps from TOA, and a Baldwin Boxall induction loop system.

 

Latest Issue. . .

Tweets from our Friends